A new trail marked on the map as No 8 – “Aspri Brysi (project)” is under construction..

It looks very promising so far as it features 2 Road Gaps, lots of high speed sections and a “berm garden”!

The altitude difference is about 300 metres and the length is around 1750 metres ( its not complete yet though..so it could be more :)) .. a really anticipated trail!!

before.jpg after.jpg berm-construction.jpg de-rooting.jpg working-hard.jpg trail1.jpg trail2.jpg trail3.jpg